Exploration Update at the Buen Retiro and Caballos Copper Projects, Chile
![]() | |||||||||
![]() | ![]() | ![]() | ![]() |
Vancouver, British Columbia – September 29, 2025 – TheNewswire - Fitzroy Minerals Inc. (TSXV: FTZ, OTCQB: FTZFF) (“Fitzroy” or the “Company”) is pleased to provide an update on exploration progress at its Buen Retiro and Caballos copper projects (the “Copper Projects”) in northern Chile.
At Buen Retiro, recent diamond drilling (holes 28 to 351) has extended the zone of continuous mineralization in the Southwest Area to 1.4 km, representing a ~40% increase from the 985 m previously reported. Copper mineralization is open along strike, with a further 2,250 m of diamond drilling (“DD”) planned for 2026. Reverse-circulation (“RC”) drilling at Buen Retiro has completed 1,050 m in four holes, with a further 3,950 m planned. Preliminary logging of RC chips has identified intrusive rocks bearing chalcopyrite and pyrite mineralisation, several kilometres to the east of the Southwest Area. Initial RC assays are expected in October, 2025. The Company is investigating the potential for fast-track production and now aims to complete a maiden mineral resource estimate and a Preliminary Economic Assessment (“PEA”) on a heap leach project at Buen Retiro in 2026.
At Caballos, the Company is expanding its Caballos drilling program to three rigs to accelerate testing of priority targets on the back of several recent advances there. Fitzroy is in the process of drilling an approximately 400 m hole (#3) at Caballos. Progress in a vertical hole (#2) from Pad 1 stalled when fault gouge was intersected at a depth of 350 metres. Two additional rigs are being mobilised and the Company intends to complete at least 3,000 m of diamond drilling at Caballos in 2025, comprising approximately 2,000 metres at the Chincolco Prospect and 1,000 metres at the Mule Hill Prospect.
-
At Buen Retiro, BRT-DDH-028 intersected 1332 m @ 0.46% Cu in oxides from top of bedrock (at 22 m downhole) to a downhole length of 155 m, including 40 m @ 0.53% Cu from 32 m, and 35 m @ 0.77% Cu from 115 metres.
-
At Buen Retiro, holes 28 to 35 contribute to extending the known zone of continuous mineralization in the Southwest Area by 40% to 1.4 kilometres.
-
Fitzroy aims to complete a PEA on a heap leach project at Buen Retiro in 2026.
-
Age-dating at Caballos identifies a long-lived hydrothermal system (44 Ma to 25 Ma), which matches the ages of well known Eocene-Oligocene belts in Chile that host such deposits as Chuquicamata, Escondida, Quebrada Blanca, and Collahuasi.
-
Mapping at Caballos identified expansion potential to the East under post-mineral-cover.
-
Three drill rigs are planned to be at Caballos in Q4, contributing to 3,000 m of drilling in 2025.
Merlin Marr-Johnson, President and CEO of Fitzroy Minerals, commented: “We have now extended Buen Retiro’s strike length by ~40%, proving both scale and continuity in the Southwest Area. Regional RC drilling is already delivering evidence of copper mineralization across a broader footprint. The Company is investigating the potential for fast-track production at Buen Retiro, starting with a PEA and associated maiden resource estimate to be completed in 2026. Fitzroy is investigating the possibility of unlocking significant infrastructure advantages at Buen Retiro which could potentially contribute to the near-term viability of a heap-leach operation.
At Caballos, several break-throughs at the project level have given us the confidence to add a second and a third rig to the drilling program. The aim is to drill around 1,000 metres at the Mule Hill Prospect in a helicopter-supported program, testing a 1.3 km-long coincident geophysical, geochemical and geological anomaly. Separately, two rigs will be part of the track-accessed 2,000 m program at the Chincolco Prospect. We look forward to publishing ongoing results from drilling at Caballos in Q4 2025.”
Buen Retiro – Diamond Drilling
Today’s release reports assay results from diamond drill holes BRT-DDH-028 to BRT-DDH-035, all of which are located in the Southwest and South Areas of Buen Retiro. The most note-worthy aspect is that the extent of mineralization along strike has been increased to 1,400 m in the Southwest Area, and the trend is still open at both ends.
In the Southwest Area, holes 29 and 35 extended the mineralization for more than 400 m to southeast, under gravels. Holes 28 and 34 were infill drill holes that helped demonstrate the continuation of widths and grades of shallow zones of well-mineralized rock along the entire trend. The Southwest Area now hosts a zone of 1,400 m of continuous mineralization, open to both the northwest and to the southeast. The gravels increase in depth to the southeast.
Three holes drilled in the Southwest Area were negative. Hole 30 was drilled at an angle away from the trend to test a potential parallel trend to the west. Hole 31 was drilled to test the extension of the trend to the southeast of hole 29, but it was still in gravel at the point where it was projected to cross the trend. A step-back was made, and hole 35 was subsequently completed which confirmed the presence of the trend, albeit under thick gravels. Hole 32 was programed to test copper mineralization below the central part of the trend but instead it intersected a shear zone and a set of strong fault zones with gouge, and the hole could not be completed.
In the South Area, hole 33 extended the zone of defined mineralization 150 m to the south and the trend is still open both to the north and to the south. In general, the mineralization here is lower grade and narrower than that found in the Southwest Area. In the event that an economic resource is defined in the Southwest Area, it is possible that some parts of the South Area may lie within a proposed open pit centered on the Southwest Area, especially where the two areas converge toward the south (Figure 1). Current drilling is focused on the zone between the South and Southwest Areas, targeting oxide and transition material.
Figure 1. Southwest and South Area showing strike extent, Buen Retiro, Chile |
Table 1. Selected Phase 2 drill core assay results from BRT-DDH028 to BRT-DDH035, Buen Retiro Copper Project, Copiapó, Chile* |
|||||||
Drill Hole |
East (m) (WGS84) |
North (m) (WGS84) |
**Azimuth / Dip |
From (m) |
To (m) |
***Interval (m) |
Cu (%) |
BRT-DDH028 |
344999 |
6920878 |
055/-45 |
22 |
155 |
133 |
0.46 |
including |
30 |
70 |
40 |
0.53 |
|||
including |
115 |
150 |
35 |
0.77 |
|||
BRT-DDH029 |
345096 |
6920594 |
082/-45 |
67 |
168 |
101 |
0.37 |
including |
103 |
130 |
27 |
0.80 |
|||
BRT-DDH030 |
344821 |
6921119 |
243/-60 |
No significant intersections |
|||
BRT-DDH031 |
345177 |
6920374 |
078/-45 |
No significant intersections |
|||
BRT-DDH032 |
344833 |
6920967 |
065/-45 |
No significant intersections |
|||
BRT-DDH033 |
345361 |
6920753 |
270/-45 |
Minor intersections |
|||
BRT-DDH034 |
344755 |
6921395 |
070/-52 |
4 |
62 |
58 |
0.21 |
BRT-DDH035 |
345156 |
6920374 |
078/-53 |
152 |
210 |
58 |
0.29 |
including |
157 |
171 |
14 |
0.52 |
|||
and |
180 |
190 |
10 |
0.48 |
*Minimum thickness of 5 m and minimum average grade of 0.15% Cu, except for BRT-DDH034 where a minimum average grade of 0.1% Cu was used.
**measured at the collar
***True width estimated to be 50% of drill hole interval.
Figure 2. Cross-section of diamond drill hole BRT-DDH028, Buen Retiro, Chile |
|
Buen Retiro – Reverse Circulation Drilling
Fitzroy has commissioned a 5,000 m RC drilling contract at the Buen Retiro Project. RC holes are being used as a relatively low-cost tool to test blind geophysical targets in the wider Buen Retiro and Sierra Fritis areas. Hole depths will vary between 400 m and 150 m, testing a range of target styles. To date 1,050 m has been drilled in four holes. Initial holes tested targets in the wider Sierra Fritis area. Preliminary logging of RC chips has identified intrusive rocks bearing chalcopyrite and pyrite mineralisation, several kilometres to the east of the Southwest Area. Initial RC assays are expected in October 2025.
Buen Retiro – Next Steps
The Company is investigating the potential for fast-track production at Buen Retiro, thanks to significant infrastructure advantages at the project. The Pan-American highway and high voltage transmission lines cross the eastern portion of the Buen Retiro concession area, and the project is close to the sea (~35 km) and to Copiapó (~60 km) and associated mining and mineral processing infrastructure. Fitzroy aims to complete a maiden resource estimate and PEA in 2026. Environmental baseline monitoring, as part of a permitting process, has already started.
Caballos Update
At Caballos, the Company is expanding its Caballos drilling program to three rigs to accelerate testing of priority targets on the back of several recent advances at the project. Fitzroy is in the process of drilling an approximately 350 m hole (#3) oriented to the west-northwest at Caballos. Progress in a vertical 500 m hole (#2) from Pad 1 stalled when fault gouge was intersected at a depth of 350 metres. Two additional rigs are being mobilised and the Company intends to complete at least 3,000 m of diamond drilling at Caballos in 2025, comprising approximately 2,000 metres at the Chincolco Prospect and 1,000 metres at the Mule Hill Prospect. Results will be published as the drilling program progresses and results become available.
Recent developments at Caballos include:
-
Os-Re dating of molybdenite from the Chincolco prospect to 44 Ma (Eocene) puts mineralization at Caballos within a well-established porphyry belt that includes the Chuquicamata, Escondida, Spence and Gaby deposits. In 2007, K-Ar dating of secondary biotite by Vale from the Mule Hill prospect gave an age of 25.5 Ma (Late Oligocene) to these hydrothermal alteration processes. These two dates, spanning almost 19 million years, indicate that Caballos has been a long-lived system straddling two of Chile’s most fertile metallogenic epochs.
-
Re-logging of Caballos hole #1 confirms hydrothermal breccias contain clasts of mineralised porphyry, a feature that is consistent with other breccia-dominated porphyry systems such as El Teniente.
-
Fitzroy has bought a 291 hectare parcel of land in the Chincolco Valley, thereby becoming a land-owner in the area, which comes with certain access rights.
-
Mapping shows that the barren, Farrellones volcanic rocks to the east of the Chincolco and Mule Hill prospects lie unconformably on top of the mineralised breccias intersected in hole #1.
Collectively, these developments support the interpretation of Caballos as a large, fertile, and long-lived copper system with both depth and lateral scale potential.
Buen Retiro Sampling Procedures, Laboratory and QA/QC
Drill core in labelled and secured wooden core trays is picked up by Company personnel and transported by truck from the drill rig to the core processing facility in Copiapó. Core depths are checked, after which geotechnical logging is performed.
Using a core cutting diamond blade saw, primary half core samples are collected from HQ- or NQ-sized drill core with the remaining half-core stored in the original wooden core trays at the rented core storage warehouse in Cuesta Cardones, south of Copiapó. A silica blank is inserted every 20 samples (~20 m); a blank is always inserted immediately after a section that contains native copper. Pulp duplicates are randomly selected in proportion to the number of samples from each drill hole and inserted into the sample stream along with high-, medium-, and low-grade copper standards. Sample identifications are changed and coded by the Company. The QA/QC samples prepared by the Company represent about 12% of the total primary core samples.
The three copper standards (both oxide and sulphide), acquired from Chilean company Instituto Nacional de Technologia Estandarizacion y Metrologia Ltda. (“INTEM”), have international standard certification. The certified standards are used to evaluate the accuracy (approximation versus true value) of the laboratory analysis. Blanks are used to evaluate the quality of the laboratory preparation and identify possible contamination. Pulp duplicates are used to test analytical accuracy (repeatability). No secondary laboratory (referee lab) samples were completed in this round of drilling; however, the next stage and subsequent stages of drilling will put in place laboratory replicate procedures.
Once prepared, the core samples are bagged, tagged, and transported to the laboratory by the project team. At the laboratory reception, the samples and their identification codes are verified and accepted once the physical inventory matches the assay request form.
The pulps and rejects of crushed samples are collected from the ALS-Patagonia laboratory in Copiapó every 3 months. The rejects are stocked in closed drums, identified with the corresponding batches and sample ranges, while the pulps are stocked in boxes and in shelves inside a container separated for this purpose. Both are located in the same Company warehouse facilities in Copiapó.
A visual review of the Quality Assurance (QA) and Quality Control (QC) results from the standards and blanks inserted by the Company and the laboratory’s internal QA/QC information was completed by the Company and no significant issues were identified.
Qualified Person
Dr. Scott Jobin-Bevans (P.Geo., Ph.D., PMP), a Qualified Person as defined by National Instrument 43-101 and independent geological consultant to the Company, has reviewed and approved the technical information provided in this news release, including the sampling, analytical and test data underlying the technical information contained in this news release. Specifically, the QP verified selected laboratory assay certificates against the reported drill core intervals as well as drill core logs against the geology, as supplied by the Company.
About Fitzroy Minerals
Fitzroy Minerals is focused on exploring and developing mineral assets with substantial upside potential in the Americas. The Company’s current property portfolio includes the Buen Retiro Copper Project located near Copiapó, Chile, the Caballos Copper and Polimet Gold-Copper-Silver projects located in Valparaiso, Chile, the Taquetren Gold Project located in Rio Negro, Argentina, and the Cariboo Project in British Columbia, Canada. Fitzroy Minerals’ shares are listed on the TSX Venture Exchange under the symbol FTZ and on the OTCQB under the symbol FTZFF.
On behalf of Fitzroy Minerals Inc.
Merlin Marr-Johnson
President and CEO
For further information, please contact:
Merlin Marr-Johnson
mmj@fitzroyminerals.com
+447803712280
For more information on Fitzroy Minerals, please visit the Company's website: www.fitzroyminerals.com
Neither Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release.
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION
This news release includes certain statements and information that constitute forward-looking information within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts are forward-looking statements. Such forward-looking statements and forward-looking information specifically include, but are not limited to, statements that relate to the potential mineralization on the Company’s mineral properties, future exploration plans on the Company’s mineral properties and the timing and results of future exploration.
Statements contained in this release that are not historical facts are forward-looking statements that involve various risks and uncertainty affecting the business of the Company. Such statements can generally, but not always, be identified by words such as "expects", "plans", "anticipates", "intends", "estimates", "forecasts", "schedules", "prepares", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. All statements that describe the Company's plans relating to operations and potential strategic opportunities are forward-looking statements under applicable securities laws. These statements address future events and conditions and are reliant on assumptions made by the Company's management, and so involve inherent risks and uncertainties, as disclosed in the Company's periodic filings with Canadian securities regulators, including without limitation, the dangers inherent in exploration, development and mining activities; actual exploration or development plans and costs differing materially from the Company’s estimates; the ability to obtain and maintain any necessary permits, consents or authorizations required for mining activities; environmental regulations or hazards and compliance with complex regulations associated with mining activities; climate change and climate change regulations; fluctuations in exchange rates; the availability of financing; operations in foreign and developing countries and the compliance with foreign laws, remote operations and the availability of adequate infrastructure; fluctuations in price and availability of energy and other inputs necessary for mining operations; shortages or cost increases in necessary equipment, supplies and labour; regulatory, political and country risks, including local instability or acts of terrorism and the effects thereof; the reliance upon contractors, third parties and joint venture partners; challenges to title or surface rights; the dependence on key personnel and the ability to attract and retain skilled personnel; the risk of an uninsurable or uninsured loss; adverse climate and weather conditions; litigation risk; and competition with other mining companies. As a result of these risks and uncertainties, and the assumptions underlying the forward-looking information, actual results could materially differ from those currently projected, and there is no representation by the Company that the actual results realized in the future will be the same in whole or in part as those presented herein. the Company disclaims any intent or obligation to update forward-looking statements or information except as required by law. Readers are referred to the additional information regarding the Company's business contained in the Company's reports filed with the securities regulatory authorities in Canada. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. For more information on the Company and the risks and challenges of its business, investors should review the Company's filings that are available at www.sedarplus.ca.
1 All diamond holes in this report are either from the Buen Retiro Copper Project, or the Caballos Copper Project identified by a common prefix “BRT-DDH” or “CAB-DDH”, respectively, followed by a number. For reader ease these have been reduced to the final two digits in the text of the news release.
2 True widths are estimated to be approximately 50% of reported intersection lengths.